Open Universiteit

Please use this identifier to cite or link to this item: http://hdl.handle.net/1820/8441
Title: Requirements for Scenarios and Prototypes
Authors: Kravcik, Milos
De Lange, Peter
Koren, Istvan
Klamma, Ralf
Helin, Kaj
Kuula, Timo
Rasool, Jazz
Smith, Carl
Zics, Brigitta
Klemke, Roland
Keywords: WEKIT
Requirements
Scenarios
Aumented Reality
Wearables
Issue Date: 30-Jun-2016
Citation: Kravcik, M. (Ed.), De Lange, P., Koren, I., Klamma, R., Helin, K., Kuula, T., Rasool, J., Smith, C., Zics, B., & Klemke, R. (2017, 4 July). Requirements for Scenarios and Prototypes. WEKIT project delivarable D1.4. Retrieved from http://wekit.studiohangloose.it/wp-content/uploads/2017/06/WEKIT_D1.4.pdf
Abstract: In WP1 the WEKIT consortium develops a framework for wearable experience, specifies a corresponding methodology for vocational training, creates suitable application scenarios, and derives requirements for the technological platform accordingly. The first findings are documented in the Deliverables 1.1-4. This deliverable (D1.4) is the first outcome of the WEKIT Task 1.4 Requirements for Scenarios and Technological platform, where the stakeholders can continuously collect, update, and negotiate requirements for Wearable Technology (WT) and Augmented Reality (AR) solutions, which should be developed in this project. The end-user requirements have been elicited through co-design activities and captured in Requirements Bazaar, a social requirements engineering toolkit that was initially developed by RWTH in the ROLE project and was awarded the best demo paper award at the IEEE International Conference on Requirements Engineering in 2013. Later on it was successfully used also in other projects, including Learning Layers. The House of Quality (HoQ) approach was adopted to offer a consulting tool for assessing technological options and comparing available tools for AR based workplace learning support. Here we present the current status of the collected requirements, which will inform our developments in the technical work packages WP2-WP5. This report will be later on updated in M21 and M36.
URI: http://hdl.handle.net/1820/8441
Appears in Collections:3. TELI Deliverables and reports

Files in This Item:
File Description SizeFormat 
WEKIT_D1.4.pdf2.15 MBAdobe PDFView/Open


This item is licensed under a Creative Commons License Creative Commons